Alt + Up, Alt + Down: Scroll vertically through the entire planner.
Alt + Left, Alt + Right: Scroll horizontally through the entire planner.
Ctrl + Z: Undo the last action you performed.
Ctrl + R: Redo the last action you undid.
Header Cells Navigation
Left, Right: Move horizontally between column headers.
Home: Jump directly to the first column header.
End: Jump directly to the last column header.
Down: Move from the headers down to the task rows.
Task Rows Navigation and Actions
Up, Down: Move vertically between tasks.
Page Up: Jump to the very first task in the list.
Page Down: Jump to the very last task in the list.
Space: Select a task and start editing its value.
Ctrl + Enter: Create a new task.
Ctrl + Left, Shift + Up: Collapse all child tasks under the current task.
Ctrl + Right, Shift + Down: Expand all child tasks under the current task.
Shift + Left, Shift + Alt + Left: Outdent the current task, moving it up a level.
Shift + Right, Shift + Alt + Right: Indent the current task, making it a child of the task above.
Shift + Click: Select multiple tasks in a range.
Ctrl + Click: Select multiple tasks individually.
Ctrl + C: Copy the selection of cell(s).
Ctrl + V: Paste the copied cell(s).
Shift + Alt + Up: Move the selected task up in the list.
Shift + Alt + Down: Move the selected task down in the list.
Task Cells Navigation and Editing
Up, Down: Navigate vertically between cells within a task.
Left, Right: Navigate horizontally between cells within a task.
Enter: Start editing the selected cell’s value or, if already editing, confirm the new value and move to the next row.
Any character or number key: Start editing the cell value.
Escape: Cancel editing without saving changes.
Tab: Save changes to the current cell and start editing the next cell.
Shift + Tab: Save changes to the current cell and start editing the previous cell.
Delete: Clear the current cell’s value and start editing.
Gantt Chart Navigation
Shift + Scroll: Scroll the Gantt chart horizontally.
Special Considerations
Manual Save Mode: In this mode, you can copy and paste tasks with their hierarchy intact, preserving the structure and any child tasks associated with the copied task.
Auto Save Mode: Copying and pasting tasks with their hierarchy intact is not supported in this mode. Tasks will need to be managed individually.